Mike the Cookie Widower's transcript of the building process can be found here.
Take a look at the pictures to see the journey of building my 16x16 slice of cookie heaven!
Take a look at the pictures to see the journey of building my 16x16 slice of cookie heaven!
1. It starts with a dream. . . and a drawing.
4. Uh oh. This is really happening.
7. Walls
10. Insulation and Moisture Resistant Drywall
13. Equipment installation, all commercial/NSF
|
2. Building permits. Are we really going to do this?!
5. Block foundation
8. Roof and Siding
11. Painting, wipe-able wall board, HVAC cutout
14. The workhorse of the kitchen- NSF Commercial KitchenAid. Sad that it only comes in white with a BRIGHT orange cord
|
3. Staking out the location.
6. Framing and pretend baking
9. Electrical and plumbing
12. Sink installation (3-basin and hand wash). Mop sink is in a closet.
15. Commercial convection oven. A serious learning curve was necessary. |
The left side of my "shop"
And the right side. . .